Search This Blog

Saturday, 23 July 2011

HS2 vs FTTH

Read more! Spent an interesting couple of hours yesterday watching witnesses present evidence to the Select Committee regarding HS2 (the High Speed Rail link from London to Birmingham). Trains move people, broadband moves data – the social, economic and environmental parallels between the two types of infrastructure have long been known (and blogged about) so of course I was interested, especially with my family ties to railways. FTTH to every home in the UK and the HS2 link have capex costs in the same ball park – somewhere in the region of £14-17Bn (more on this later). So, let's debate which is the more worthy project for our ever-diminished pot of tax payer's money; although in an ideal world, you would build both. Now.

This blog post can be read at 5tth.blogspot.com



Much of the evidence presented for HS2 is of direct interest to anyone considering an infrastructure project of the size and scale and impact of Fibre To Every Home or Next Generation infastructure – a mega project - and it would be foolish to ignore it. It is also interesting to note the similarities of terms – high speed, connectivity, communication and capacity apply to both rail and telecomms, and meld these megaprojects ever closer.

My knee jerk reaction is that FTTH is a one off spend which requires little additional lifetime spend from the central or private pots to reach every home in the UK and change the lives of everyone; whereas the HS2 link will affect initially only a corridor and requires more and more spending once in place eg improving the classic rail and road networks to cope with the increased capacity. If there were to be only one megaproject this decade, spending under £20Bn, it would have to be FTTH.

However, the reality is that we need transport of freight and people as much as of data, although passenger journeys could obviously be reduced with the provision of FTTH.

A reduction in passenger journeys could affect the business plan for HS2, meaning it would require further subsidies far into the future to become profitable. Or, it could mean premium pricing on HS2 would could make it a “rich man's railway”, which would inevitably mean a failure to bring the benefits to all. The economic evidence given by the French witnesses clearly showed that pricing management is key to success, and the market share owned by both Eurostar and SNCF over the airlines, including budget airlines shows, once again, the sense in making the product affordable.

Not only does Eurostar now have 80% of the London to Paris market share, but both Eurostar and SNCF have found that the purchase decision of whether to travel by air or train has extended to 4 hour train journeys where it used to be 3hrs ten years ago. This can only mean more customers using the service.

The possibility of increased productive time for business travellers on the train was cited more than once by different witnesses, and personal time savings were a recurrent theme throughout the sessions. Time savings and productivity for individuals and businesses apply equally to FTTH economics, but are often missed out in cost benefit analysis for FTTH and next gen, yet this time saving of even a few minutes between London and Birmingham seem key to pro-HS2 arguments.

The weight this time saving is given on High Speed Networks cannot be ignored. A single stop on a HSN adds 7 mins to journey time so many of the high speed links in France, and beyond to Germany, Austria, UK, Belgium etc, have very limited stops. Why? Because it is the speed of the journey which wins passengers. Now, apply that to FTTH and next gen. Incremental increases of speed (or a few more stops on a journey) can make all the difference in people seeing the benefits and becoming customers, or not. Time savings = increased demand. The bigger the time saving, the higher the demand. So, it does not take a genius to see that 1Gbps will see more demand than a tiny leap to 24Mbps. I expect to see this aspect of time savings added more and more to telcos' marketing material over the coming months and years.

However, there are other factors with HSN (and FTTH) that can be factored in to show why the time saving purchase decision has increased 25% from 3 to 4 hours. Increased airport security, congestion on roads, price of fuel, relocation of business interests (customers and suppliers), regional regeneration, productivity on train vs airline or car etc all act to assist in deciding to travel by train. Or to use FTTH. So, no doubt we will shortly see bizarre viral videos of babies being frisked at airports to justify why you should pay for a premium broadband product.....

Value For Money has been key in Network Rail and other organisation's surveys of passengers, and it is hard not put an additional weighting on this when considering the pricing policy for broadband too. Although the Eurostar market is mature and has almost reached saturation, marketing activities and offers always see a rise in seat sales. In other words, the successful rail companies do everything they can to fill their little fat pipes (trains) to capacity, whereas we know that telcos do everything they can to limit usage with FUPs, data transfer limits etc. And I would say that people complain far more vocally when the fat pipe they are travelling on is full and they need to stand than when data bits are crushed together to reach their destination....

There was a claim that economic growth inputs such as job creation and tax generation have not been considered properly in the HS2 assessment. The same could be said for FTTH. A claim that HS2 will bring £44Bn economic benefit appears to be a finger in the air exercise, and it would be very interesting to see government give serious consideration to FTTH and HS2 economic growth inputs. It seems that KPMG have done an HS2 assessment in Liverpool but I for one would like to see a similar FTTH assessment done in a rural area, particularly one that is on the HS2 path, to show a comparison of the economic benefits of each megaproject, as well as scenario planning to show how FTTH could impact HS2.

In fact, the type of scenario planning that a private investor would carry out if HS2 were a privately funded project are noticeably absent to date. The key threats to HS2 being a success vs a disaster given appear to include FTTH. The worst case scenarios according to witnesses would include:

  • a slowdown or meltdown of the economy
  • a PR disaster such as with pricing policies (rich man's railway)
  • rise in interest rates or capital costs
  • improved communications reducing the requirement to travel.
  • a major increase in road capacity which is free at the point of use ie not toll roads
  • a depression in oil prices which would reduce the cost of motoring

The final two of the above six are unlikely. Of the remaining four, the most likely 'threat' is improved communications becoming widely available eg FTTH, with the rise in interest rates and a PR disaster due to pricing being the next most likely. The pricing problem can be easily avoided, whereas the interest rates and capital costs should have already been taken into account through scenario planning. (Hmm!) And the risks would be substantially reduced by a Build Quickly model, yet it will be 2026 before HS2 is finished. (2 years after the demand for the additional capacity is reached). One wonders how quickly A.N.Other country could deploy either high speed network......because timescales such as this feel like another example of a great British failing with infrastructure projects – timely completion and hence sticking within the budget.

The consideration of the economic impact FTTH would have on HS2 appears to be missing entirely from any business case, and hence the predicted need for future public subsidy for HS2 when it impacts passenger journeys. Railways are heavily subsidised by the UK taxpayer whilst the same cannot be said for FTTH and next gen.

In fact, this raised a very interesting point for me. Whilst broadband is often cited as the 4th utility, there is a utility already in existence which we are funding with taxpayer's money – the public transport system. Without that subsidy for that utility, this country quite clearly would grind to a halt, especially if the freight group and passenger representative's comments are anything to go by. So, actually, broadband/telecoms is probably the 5th utility. (Which I rather like considering the name of this blog!!)

It did make me wonder though why, if broadband is SO important, we are not looking far more closely at it being publicly funded and built as a national network. The witnesses were quite clear – HS2 could not be built by a private investor or company. So, why on earth are we expecting our 5th utility to be built in such a way?

The chairwoman of the Select Committee asked if the HSN in France was considered as part of the overall rail network. “It is a leg of the rail network”. We need to look at both HS2 and FTTH in the big picture and in both cases, the impact of high speed networks goes far beyond the (railway or telecom) lines.

“High speed networks are not a gimmick” The high speed network brings people closer to the big decision centres, airports, customers, suppliers and to address new markets.

SNCF were clear in their point that it falls to local authorities to reap the benefits of the high speed network by making strategic investments into business parks, employee training opportunities, better road links, car parks, regional development etc ie everything indirectly related to the provision of a high speed network in the locality. Ensuring there are sufficient business parks for companies to relocate to is vital, as is offering training in non-railway skills, and improving road links so there is no congestion.

This ripple effect that leads to the big picture applies equally if not more so for FTTH and it often seems frustratingly impossible to point out to local authorities just how many sectors broadband will touch and what the needs and opportunities will be. LAs often seem to get stuck in thinking it will bring new IT companies to an area, whilst totally ignoring the fact that every single aspect of our lives will be touched by better comms infrastructure. Health, Wealth and Learning, and all that those three categories encompass. Just as railways will impact the carbons emissions policy, so will FTTH, and so local authorities need to consider economic, social and environmental impact in their strategic thinking about FTTH and railways.

One thing that became clear as being wrong with both HS2 and FTTH is that Britain, as with many other governments, are bloody useless at the “Predict and Provide” approach. The West Coast Mainline upgrade is a single example. It took 8 very painful years to upgrade, cost £6billion of public money and untold billions of private/business money with all the problems caused, and premium prices for a sub-standard service were the norm during the upgrade (sound familiar?!). Now, within a mere 6-10 years it will be at capacity.

However, the Victorians it seems had a far better approach and many of the tunnels, sewers etc built during that time are still doing the job required. The lessons I learnt about sewer building appear to be increasingly important. We need to over-predict and over-provide for infrastructure, whilst being realistic about possible under-demand when building the business case. Just because a business case for infrastructure may seem to have a longer lifetime payback than would seem ideal ie 15-25 years rather than 3-5, the reason for using the higher spec will become obvious over the lifetime of such a project. Which may, in all reality, be after our lifetimes, just as the Ribblehead Viaduct and London sewers have proven.

This extension of lifetime value beyond our own lifetimes is a concept we currently seem to have a problem with, especially when private money is involved and those spending it want to enjoy the returns. However, when building a next generation network, whether railways or telecoms, that lifetime return is of key importance and shows why cost-cutting exercises or allowing private concerns to hold sway must be eliminated.

The parallels between railway and FTTH kept coming thick and fast. The complexity of pricing mechanisms, the creation of bottlenecks, the need for consumer choice, effect on house prices (but FTTH has a more positive impact when there is proximity to the network than HS2), failure to appreciate the big picture, lack of comprehensive business and scenario plans, need for good local connectivity, inevitability of data/passenger/freight increases, environmental benefits, complexity of pricing mechanisms, tax payer subsidies required, importance of reduced journey times for people, freight and data, need for representatives from all stakeholder groups, interventions must have business case AND funding, quality and reliability of service is essential, must use existing infrastructure, long term view of use of released capacity, need for a big step change, creation of new business markets, make sure the regulator is the right regulator etc.

Hearing that some solutions could be applied now to relieve the problems on the transport network – adding additional carriages, lengthening platforms and loops, improving traffic management to add extra paths, derestricting first class carriages etc – struck an unhappy chord. Sticking plaster solutions that will at best buy a few extra years before massive over-capacity on the network has to be accepted and dealt with. All too bloody familiar for those campaigning for better broadband.

Possibly the most important lessons were those given by Lord Berkeley.

  • Confidence in capital costs and interest rates could give a 20 year investor view
  • Build it quickly – speed is the essence
  • Look at the competition
  • Don't change your mind halfway through [as has happened with the definition of broadband. And 21CN]
  • Having built it, make sure a proper regulator is in place

The current estimate for HS2 is around £17bn, although this figure fails to take into account the need to spend on upgrades to everything else affected – link roads, parking provision, etc etc etc. The lifetime economic return has been variously estimated from £6bn to 44bn, although both these figures seem to be 'finger in the air' and omit many costs which will be borne by private individuals and business during the build and beyond. HS2 will also not affect many millions eg those in the North of England will not travel to Birmingham to cut a few minutes off an overall journey time to London, the South or the continent.

The cost of FTTH using the most recent figures is £14bn to EVERY HOME in the UK, half that which was given almost 10 years ago by Analysys Mason. The additional spend required eg local training opportunities and business parks will be to capitalise on the value of the network, not to resolve problems caused by it.

The lifetime costs (as compared to HS2) and the resultant value from the high speed broadband network in itself would seem to me to be justification for giving very serious consideration to FTTH as a publicly funded, national infrastructure project, just as we are doing with HS2. FTTH will bring untold billions into UK Plc and the national economy during its lifetime. It should not be left to private investors, as the expert witnesses are clear about with HS2 after the lessons of HS1. Figures which other countries have produced for GDP increases from FTTH should be added here, and no doubt will be by my good readers!

The similarities and need for both high speed networks cannot be disputed and long term planning and spend on both is essential. What we need to do now is apply the lessons learnt during evidence given for HS2 to FTTH, and JFDI the right way.




Read more!

Thursday, 21 July 2011

Homesick

Read more! How I feel tonight ... Bit odd... But after untold meetings in the City, I think I am homesick. For action, community engagement, seemingly impossible solutions made good, n that JFDI attitude I was taught "at home"
This blog post can be read at 5tth.blogspot.com


I've already tweeted I can't blog on the move. It may surprise you, or not, but I cannot afford to replace a very old and broken computer. The choice was come to London twice, or replace the eee pc. Rightly or wrongly, I came back to London to fight this corner.

If I could have blogged the last 48 hours, I suspect the interested readers would have been numbered on two paws. That seems to be the size if the rural broadband game right now. Why? Because BDUK and so-called initiatives to encourage competition have achieved the precise opposite.

Luckily, there seems to be a hard core who intervention etc has not taken out. I appear to be inordinately lucky to still be part of that enthusiastic die hard bunch who will JFDI.

But our resources are wearing thin. Even blogging this is a late night struggle in a device intended more for my twins to communicate with than for me to share where we are at right now.

This year, 2011, I have watched as company, org,academic etc made fiver to the home work. Not one of them set off to do so. But there are now multiple 5tth examples out there. Nigh on 10 years in , I am chuffed to bits.

Better still, major corporates are now playing outside of the govt boundaries, proving I think that our society approach has layers if investment and engagement potential that works for business.

What thus could do for BDUK etc .. I think that if it connects real people to future proofed sustainable community connecting networks, it can only be a great thing.

The community has already evaluated, at ni expense to the public purse, the time wasters and eliminated, locally, those wo cannot and will not, in the local vernacular, do owt, at no cost to the public purse.

(If you need naming here, you need better community engagement professionals!)

I miss home right now because no-one here can sell me a solution for the future that I do nor believe my neighbours cannot deliver far better. Thus is not a north-south, urban-rural discriminatory thing, it is FACT.

So, as various projects go live this summer, remember the homesickness when you realise that some of us have done our headless chicken impressions darn sarf on our own dish whilst knowing the truly worthwhile stuff is going on up north. Yep, I'm homesick!!

Typos? It's an iPhone.....


Read more!

Sunday, 17 July 2011

Cumbria Broadband Slowspots

Read more!

We have mapped the identified slowspots in Cumbria from data which appears to have come originally via BDUK. This map shows all those places where properties cannot receive 2Mbps or higher. We do not believe this map is complete and are asking the help of Cumbrian residents and businesses to make sure the full picture is understood, and publicly available.

This blog post can be read at 5tth.blogspot.com

The full Cumbrian broadband slowspot map is available here.

Zoom in, and if there is no circle near to your house or business premises, or within your postcode area, and a speedtest.net test shows that you receive under 2Mbps, please complete the following form and we will add your postcode to the map.

If you know of others nearby who suffer slow broadband, please help them to add their postcode too and tell others about this map, wherever they are in Cumbria, and the press, the radio stations, blogs, twitter etc.

(Due to some discrepancies with how Google maps renders postcodes, we think some of the postcodes are slightly misplaced on some browsers. We are working on this).



Should this data be available in the public domain for every county? We believe so. Then, use the people who can actually run the speedtests in their houses on their equipment (with whatever limitations that has) to pin themselves to the map to get a far truer picture of broadband in the UK. Ditto for mobile coverage.

UPDATE: BBC are announcing a similar crowdsourced exercise for national mobile coverage tomorrow. Hopefully the data will this time be made publicly available and stay on the website forever.

Read more!

Saturday, 16 July 2011

Moderation on comments

Read more! Due to spam on older posts causing problems, there is now moderation on comments. Had to be done until the blog is ported elsewhere or Google sorts Blogger out. Please, be patient and if you want something to go thru moderation in double quick time, DM me [Lindsey] on Twitter or FB. Cheers for your tolerance.
This blog post can be read at 5tth.blogspot.com


All comments (or most) are now moderated. If you have an issue with a comment that has not been published, get in touch. Cheers
Read more!

I'd like to know.....

Read more! If everyone in this country was connected to a min 100Mbps symmetrical pipe, or more, by 2015, and let's assume that those who like using the Net level out the usage for those who don't, what exactly would it cost and to whom? Not the actual FTTH solution but the bits that will need to be transported around the country....how much will they cost and what precisely do we need to achieve that aim?

This blog post can be read at 5tth.blogspot.com



We all hear how scarce they are, these bits, and we know that the core network is struggling anyway, but JANET upgraded their core network recently so we must have actual hardcore (ouch!) figures to play with.

Don't stress over how it gets to each person, just assume it does. What do we need in Telecity, Telehouse, datacentres, bitmines etc etc to achieve what Erol Ziya wrote about all those years ago - the cheapest country within which to move [unlimited - my addition] data?

Which, it seems to me at the end of a long week, is what we surely STILL need to achieve.....

But how to do it practically? The investment needs to come not in the first mile alone (like *that* is happening, ho hum), nor in the middle mile alone, nor in the core alone. It needs to be across the board.

Ergo, my tired little brain would suggest, this requires a cunning plan. A collaboration. A big picture with a road map to the endgame.

So, who out of our dear, expensive analysts has considered this? Who has the requisite data?

Because, it seems to me, that every which way we turn it all seems to be "too expensive" to do. Telcos don't want to do FTTH in the first mile and are struggling to even see the point of less suitable technologies as economic solutions to properties; backhaul is bloody expensive for communities, ISPs, etc; and longhaul seems to be a struggle too if you talk to ...well, pretty much anyone.

So, what do we need to solve the problem of transporting bits around this country in the most economical and affordable fashion possible to help bring a long-awaited end to those arguments?

Your thoughts are welcomed.....

Read more!

Friday, 15 July 2011

Especially for Somerset - Google tests uber super dooper fibre

Read more! Google have now installed part of their fibre network at Stanford, and the rollout continues apace.

This blog post can be read at 5tth.blogspot.com



Dear Somerset,

Perhaps you would care to ask some of those on Stanford Campus what on earth they might need such connectivity for and why on earth a company (who should know better according to your arguments) such as Google would pay for it?!

Read more!

Is Cumbria JFDI Part 2?

Read more! I feel I can better expand on the Broadband Industry Day last week after catching up with some thoughts of those who were there too this week.

This blog post can be read at 5tth.blogspot.com



There appears to be a mix of emotions surrounding not just that day and who was (and wasn't) present, but also the procurement process and progress in general.

There is one question which I feel needs to be asked over and over again until we get a reasonable answer: Why has Cumbria County Council chosen the short list for suppliers when the Council does not even seem remotely clear about what it requires and is therefore procuring?

The second question which follows that is: why are IT services included in the spend of a £16.8M pot destined to solve the rural broadband issue, not CCC's infrastructure problem?

It seems the second list is now down to four (CTC have dropped out because they were actually more interested in the IT services list, or so we hear) - BT, Cable & Wireless, Commendium and Fujitsu.

This is an eclectic mix to say the least. C&W, Fujitsu and Commendium all appear to be working on a telehealth experiment in Shap together. (About which it appears Shap know little to nothing). One could wonder if there are actually only two players left in that list? In which case, as CCC are still unclear precisely what is to be delivered, how on earth are Cumbrians to believe that these may be the best suppliers for the still-to-be-defined task? Particularly as there are other suppliers who fail to meet procurement criteria in multiple counties now who could deliver in a more agile and probably cost-effective manner, who seem far more interested in working with the communities.

My slightly more positive feel about BDUK and CCC on leaving in the pouring rain on Friday does not entirely appear to be reflected by others present. And having heard their concerns, I have to admit to beginning to feel as though we are on a roller coaster which may find itself running out of track before ere long. However, there is agreement that there are definitely some hearts in the right places, and support for community broadband. But there seems to be a growing feeling that process and bureaucracy may prove the undoing of the mere mortals/human beans that should be being served by the process rather than vice versa.

The suppliers seemed to have been a variety of - 'scared stiff', 'gobstruck' at the professionalism of the community presentations, as well as eager (or not, in some cases) to work with communities, as well as keen to work with other supplier partners (or not).

There is a concern I think that there will be a power struggle to ensure that the second list do actually deliver what Cumbrian communities need, now and in the future, and do not just pay lip service to what CCC and communities are saying purely to win the bid. This is extremely likely if CCC do not clearly define exactly what needs to be delivered and understand at least approximately what that may/should cost.

PhilT put this rather succinctly the other day when commenting about technology neutral bids when he said that what we should be doing is defining the gigabit connection and then allowing the suppliers to indicate precisely how they would deliver this. Rather than giving the suppliers enough rope to hang the entire county with which is what I think many are concerned that CCC may be doing, inadvertently or otherwise.

I did feel frustrated on Friday that there still seem to be too many on very steep learning curves, very late in the day, and that there simply is not enough collaboration and sharing of knowledge going on. To assume that all the knowledge is within the suppliers' camps is a disproven theory now, and actually it could be argued that some of the information that the communities now hold is far more commercially sensitive than that of some of the suppliers. Particularly those suppliers who are only in this for the money.

I think that as we are a Big Society area and were specifically given instructions by Nat Wei in Kirkby Stephen to kick down the barriers which prevent delivery of the right solutions for this fair land called Eden, that some of those barriers may be about to receive a serious kicking to remove them once and for all. And to be honest, not a moment too soon after the Project Access debacle.

It would also seem that some of the suppliers are treating this simply as a commercial process, which is fine, but in times of tight budgets, cuts etc, one would have hoped (in my little idealistic world) that perhaps the Council would work doubly hard to ensure that the money goes as far as possible. One community has reported that a supplier took away their shopping list to 'shave a few pounds off it' and came back with something that was almost double the original costings.

Which is standard public funding behaviour (think of a number, add a zero, times by pi) but in this day and age, and for community broadband for a county such as Cumbria which has such a high proportion of experienced fibre and broadband folk - that's not going to fly, is it, eh? Or one would hope that the Council would see through such behaviour and stamp on it.

I am beginning to wonder whether I am correct in believing that a growing number of folk are disenchanted with the entire procurement process and are actually planning to JFDI without the backing of the Council. Yes, it could prove inordinately difficult, but that depends on whether the rest of Cumbria understands what is going on and backs these communities. After all, it is not too difficult to vote out those who have been elected in the future if the actions of a few determined folk prove over time that the Council went about things the wrong way.

In reality, it only needs one reasonably sized community to work together with smaller suppliers, who could not even make those short lists, to JFDI, and a spotlight could be turned onto the winners of the bid to ensure they deliver above and beyond what 'hicks in the sticks' can. However, this would mean building a world-class network and not an interim solution; but it seems that there are at least two of the pilots that are already at the required level of knowledge and planning to carry that through. I suspect there are more who are not as vocal or as public who could also be a 'threat' to the Council's procurement over the coming 2-5 years.

And this, to me, is where things may well get interesting. If the communities act together to share information, skills, knowledge, best practice, we could see some best networks built on and in Cumbrian soil that surpass anything that the winner might choose to deploy given a commercial choice. And all of us will be far more interested reading a front page of the Herald that shows people we know, in places we know, digging where they live, than passing yet another BT van at the side of the road.

£16.8M is a drop in the ocean to some of the companies on that short list, but it could still turn dirty. It's not about that funding; it's about landgrab and having customers who may stick with the supplier for 20 or more years into the future. Trouble is, oh supplier friends of ours, this is a very tight-knit community and our jungle drums are far faster than any broadband you may care to install! Dirty tricks will be exposed in less time than you can dip a sheep, and will be shared via our traditional communications routes. And Cumbrians are vocal!

At a time when Cumbrians are struggling to make ends meet, wastage of what is viewed as OUR MONEY, paid from our TV licences, is likely to be taken badly. And if CCC act properly and there are penalty clauses for failure to deliver, this could become a costly exercise. But, let's not jump that dry stone wall before we get to it, eh?

Rory said he wanted to see spades in the ground before the end of this year. Or that's what I heard, but someone else thinks he said before the end of August. That being the case, we have come up with a pilot that could potentially do just that. And to me, that is one of the joys of rural living. Throw an idea into the communal pot, toss it around a little with your neighbours who are equally as passionate about Eden, work out the kinks and details, and then JFDI before moving on to the next project our communities need that no-one else can work out how to fund or action!

Watch this space....


Read more!

Wednesday, 13 July 2011

Joining the dots

Read more! I wrote a post earlier about the social media surgery today on the CLA stand at the Great Yorkshire Show. I don't get out often (!) so it was quite interesting/eye opening talking to real people about their broadband and IT problems. (Very similar to going to the co-op actually; proving 'you don't need to travel far to see the world' - Amy Mason, interviewed by LAnnison, approx 1995 UWN)

This blog post can be read at 5tth.blogspot.com



It was properly, stupidly depressing to see SMEs, similar to mine, in the same boat as mine for similar reasons. NO SUPPORT. Zillions of quangos and not a single one seems to have a figurehead who gets IT. With our money. Let alone staff who are delivering what is required on the ground.

It seems to me after an inordinately long UNPAID month that has cost me everything I had for boring shit like food for July already, that the time is nigh for "doing stuff". I've been here before so I have a sort of 'cynic' button that generally kicks in to protect my kids from irrational actions, but this is one of those times where I feel (a globally trusted meter for investment!)/have felt that certain things appear to be falling into place.

However, I have to say that the vast majority of my conviction that this is the case comes from an utter despair at what I keep hearing and a belief that "this cannot go on much longer". Maybe my emotions are just mirroring the news. Maybe, just maybe, moments such as a vast media mongulcorp heading on t'butt down the cobbles towing respected institutions behind does that to you. Or maybe, just maybe, the constant failure of overpaid, smug, fat possums, forces you to think that there is a chance for you to succeed with your great ideas, innovations, inventions, products, services etc that can be achieved on a broken shoestring. Sadly, I saw little to zero of that at GYS today. I've been going there for over 30 years so it wasn't some novel experience.

Even short but intensely wet rides on a motorbike allow you to ponder (Friday) and long but lost trips out (Monday) give you a potentially very long noose to hang yourself with. Both of those trips, and several others since Friday have left me with a certain feeling.

A two sentence background - on Friday, I was told to 'get something in' by a meeting on Tuesday, ie by Monday. Never mind I have two children who sort of could do with seeing my face not my back nor hearing that cussed tapping on my ancient and truly knacked keyboard, or that perhaps my business needs attention. Oh no.

We, the people of this country, know what to do. We have, without benefit of overpaid think tanks, consultants, or year on year budgets to play with, thought through the options. For more than a decade. Mostly, we are roundly ignored. That's fine. BUT, when communities and grassroots people outshine the so-called experts BY A BLOODY MILE and are asked to present our plans to prove that the public purse could be put to far better use than an existing fat-bellied, over-populated cattery can,

and, and, AND are willing to start asap, We JFDI.

Emails which arrive saying, This should be deliverable from April 2012 under the current procurement process....if all goes to plan........ well, work this post out.

What you actually mean, oh governmental quangos is, "Allow us to run you around for at least 12 more months. And blow the pot to smithereens. By the time we get back to you there will be none of YOUR MONEY left"

No. No. NO and no. I've just spent yet another day with people who get a wage packet. I don't. I am your target audience as a rural SME without broadband who is trying to bring up her family as a single mum whilst running a business that blows the socks off most others in knowing what is coming in IT. Have you *EVER* supported me? Or have you bled me dry?

I was volunteered to be present last Friday, I spent all weekend writing a proposal (or two as it turned out, for BDUK), I spent yesterday trying to work out how to get a vehicle through an MOT with no money, and today sitting on the stand of an over-funded body's uber expensive GYS stand and having to work really hard to get a free coffee. I am now, at 3.28am trying to upload photos so my resident trolls and the press have something to play with whilst I try really bloody hard to find a paying customer tomorrow before I am expected to support a local pub by taking my kids and I to supper club (we will be washing up), after dealing with a client who I know cannot pay but I can help, and then to a meeting on Thursday eve that I probably will have no fuel for. I have none now so unless we suss ethanol production by Thursday.....

Big Society? Run in the community benefit? Contribute to your area?

How about, as I said to a handily re-named organisation about 8 years ago and have oft repeated -

"When will you stop running existing businesses into the ground?"

Destruction of Trade and Industry may have come up in the conversation....don't even ask me what BIS stands for.

Do you really think I and many, many others are continuously willing to play a game, providing untold evidence, research, ideas, joined up thinking for you all because ONE DAY you might pay us? Or that we may get a career out of it? Pah, pah, pah and double pah.

I have seen how normal everyday people like the farmer clutching at AI straws today get tret by Westminster. (And yes, that's a word here in Cumbria.)

You are about to waste untold millions of OUR money because you are

INFLEXIBLE
LOCKED IN BUREAUCRACY
LOST/CONFUSED
OUT OF TOUCH
UNASHAMEDLY & KNOWINGLY WRONG
AS IMMUTABLE AS AN OIL TANKER

Do you know what, folks? It is time to CHANGE. We don't want your bloody money, we want you to STOP WORKING AGIN US. With OUR money.

If BIG Society means anything, it means stand back, pin back your lugs, watch and listen. You lot know NOWT.

And I am seriously fed up of being driven into bankruptcy, and being unable to support my own children, or community, so you can draw your wages and spend my taxes and BBC licence fee.

Here endeth today's rant. But not my work as I have a business to run that no-one else could today or any other day.....................70 hour weeks? In my dreams.










Read more!

Saturday, 9 July 2011

Is Cumbria JFDI? Part 1

Read more! Spent most of yesterday at Stoneybeck Inn near Penrith at a community and suppliers day organised by East Cumbria Community Broadband Forum (ECCBF) and BDUK, and MCed by Rory Stewart and Libby Bateman. I'm not sure what the other BDUK recipient areas are doing, and would welcome updates from anyone who is aware of the forward motion elsewhere, but here is a summary of yesterday in the Cumbria Community broadband world.

This blog post can be read at 5tth.blogspot.com



 It may be a recession, but many community people managed to take a day away from work to partake in this event. There were also a substantial number of supplier representatives there, whose offerings range from the whole caboodle through to component parts or services, including BT, Fujitsu, Cable and Wireless, MiniFlex, AFL, Commendium, NextGenUs, Ericsson, and included the majority of those on the procurement short list. Cumbria County Council and CLEO were also represented.

My overall impression is that these structured yet informal events not only bring out the best in people, (as do the colloquia) but also see far more forward motion than a simple talking heads do, such as the vast majority of conferences end up being. Without being party to many of the commercially sensitive discussions which were undoubtedly ongoing during the event, it seemed that the sales pitches went far beyond "this is our standard offering" because the communities have well-developed visions of precisely what their communities want. There is going to have to be a shift towards the centre ground, of compromise, and this event definitely seemed to be pushing things in the right direction by both 'sides'.

Thinking of it is as "them and us" (suppliers and communities) is however inappropriate as it is clearly obvious that what are being developed are partnerships. BDUK and the County Council have made it clear that suppliers are going to have their work cut out ensuring that whatever is delivered involves the communities to whatever level each community wishes to be involved. Whilst what is being built must be commercially sustainable, it also has to suit the communities at least as much as it suits the suppliers. Collaboration and co-operation are the watchwords here.

So, the suppliers, including BT, were "harangued" in the nicest possible way by Rory Stewart MP to contribute, talk to the communities represented, and work together towards the common goal that is next gen broadband across Cumbria using the recently announced £16.4M, the immense goodwill and passion exhibited at Rheged, Great Asby and other recent events, as well as the existing assets in Cumbria, such as CLEO (the education network).

Several communities had been chosen to give updates on their progress and outline their thinking, both to share what was being considered around the county and also to assist the suppliers in considering where and how they could assist in achieving the goals being set by the communities. Fibre GarDen, Great Asby, Eden Valley Digital, Grange and Cartmel LAP, and Northern Fells all gave presentations.


Different scenarios were defined prior to the meeting:

  • The quest for community backhaul solutions
  • Solutions for demand aggregation
  • Build and Benefit schemes
  • Community Data Books
For many, the backhaul issue is still one of the most thorny. Cost by length, firstly, means that for many rural communities the cost of even a limited feed can be exorbitant. The difference in cost between a 100Meg feed and a 1Gig feed is actually minimal, but for most communities the cost of such a feed means the business plan is unnecessarily hard to resolve. Backhaul players need to start thinking more clearly about whether they want one big customer - a community, or no customer at all.

Obvious solutions are using existing feeds in the community - NHS, public sector, schools, libraries etc, but once again we are back to a medley of red herrings - security, contract will not permit sharing, and general faffing by telcos who sometimes would seem to prefer that half the country remains disconnected rather than think out of the box and use existing capacity with a novel approach. 

There are other solutions which were mentioned at more length in the networking sessions e.g. railways - Network Rail, Global Crossing, and smart grid solutions using assets of Electricity North West. The difficulties with all of these seem to be completely surmountable IF the above companies and organisations stop prevaricating and help solve the problems. Doing so would create win-win situations all round, and it is time for these bodies to get with IT and get out from behind the buffers. Network Rail should remember who paid for the fibre assets on the railway line in the first place!! Joined up thinking is not that difficult and many of the problems the larger organisations cannot see solutions to simply require a brief chat with one of the many community people who have thought through all the possible solutions to assess the best approach.

Much more to say, so am going to write this as a multi-part post. (And hope that Blogger's photo app starts working again before I finish!

Read more!

Wednesday, 6 July 2011

CAN in a BOX

Read more! Once upon a time, probably late at night, I had this idea to empty my inbox of all the questions that were beginning to inundate me, by creating a FAQ, a wiki, a road map, a hand-holding guide to community networks. I think this was about 2000. By 2001 ish, it had a name - Community Access Network in a Box. I was knocking around with artists and musicians at the time, and the round peg in a square hole seemed about right for many aspects of my life, then and now!

This blog post can be read at 5tth.blogspot.com



CAN in a Box has over the years struggled to see the light of day. (The most recent iteration of it has been living in a box under my desk, and is about 10-15 250 sheet pads of notepaper, handwritten and organised into chapters. Another serious quantity of it is, I think, in a garage many miles away. I hope they have used it to light the fire as seeing it again is not in my game plan).

No-one would fund it, and no-one really cares for my scribblings!

However, there are some ideas which simply refuse to go away. I am getting more than a little accustomed to not being credited for my ideas, and the outright theft of others to suit people's career, income and ego-boosting plans is irksome. But it doesn't stop the ideas waking you up at all hours - day and night - to write them down! And give me the freedom to organise an event, as I have been about broadband since before the vast majority of this country knew what it even was, and I always found an opportunity to push CAN in a BOX.

But, develop a simple term like FiWi (2004, Bethnal Green with FreeToAir Adam - notes available) and the world and his lobster thinks they thought of it in 2008/9. Or was it later they coined it? Oh, who cares? I know where it began.....they were not there.

A network for people doing community broadband (1998 - phone and email, Arwain, John etc in Cambridge, Daniel and a host of others) and a couple of years later, that becomes lost in something which I understand will be launched again in a few hours, by one of the late arrivals whose thunking I really miss having access to, as version 5.2 or wherever we are now to support community broadband. (You heard it here first. CBN v 5.2 is coming at ya! And knowing nothing, I believe this time it may have a chance.....)

But may I yawn?!

Why is it all taking so long? We are not surrounded by total morons, bureaucratic idiocies can be kicked in to touch courtesy of Big Society now (but that's not a new concept for us Brits!), and I came in after a 10 year fight, so it has now been - get this - 25 years trying to do FTTH.

Let's move the pace up, guys.

13 years after I actually finally started to make contact with people who thought like me in the UK - I'd spent 2 years drifting in an IRC world of informed geeks who didn't speak UK English, and civil servants who found me foisted onto them by heads of department and ministers who didn't have a clue about these 'fat pipes' I needed to run my rural business, it seems CAN in a Box may have found a moment in which to reach the real world. And I am sort of hoping that some of the other great ideas like the Association of Broadband Communities, which became CBN, then INCA, may now have found their time to exist in a positive and purposeful manner.

I think this is a record though. I know from experience I am an absolute minimum of 4 years' ahead of what is called 'innovation' in this country in the broadband arena, and every sector that it touches upon - rural sustainability, rural development, eco housing, small business growth, environmental issues, etc. But 13 years? Hell, I can hardly recognise my writing from that long ago!

I know it's summer, but I have barely been out doors for weeks. But the energy does get through my duvet cover cum curtain to inform me that others are bouncing off this extra light we have.

Now, folks, all you need do is direct that light down fibres to every home. Stop believing the BS, stop pandering to people in overpaid jobs who know nowt and do less, in case they upset someone with a massive pension deficit and , sorry, but really, JFDI.

Read more!

Tuesday, 5 July 2011

There's always a way...

Read more! This wee tale highlights the fact that the current approach by this government to rely on the #fail telcos to put in any level of next generation infrastructure is more than misplaced. It's likely to waste hundreds of millions of pounds and put Britain into the slow lane for years, because the telcos simply cannot get out of the box. Community networks can.

This blog post can be read at 5tth.blogspot.com



Lovely anecdote from Tim Nulty that hit my inbox last week:

One of our potential subscribers who needs the drop to be underground but doesn't want to pay the big extra cost called to say that he had buried a garden hose in the right place and could we put the drop through it?

I said I'd ask my engineers.

They said: "We can if we can get a pull-wire through it".

I told this to the subscriber--who called back an hour later to say: "I've got the pull-wire in place."

My engineers' reply: "Cool. We'll do it then. First time for everything."

It is dead simple. JFDI.
Read more!

Using *what* to lay fibre?!

Read more! And there was me thinking my idea to train ferrets to run fibre through ducts was out the box!!

This blog post can be read at 5tth.blogspot.com



A while ago, I discovered that Boeing had used ferrets to run cabling through their airplanes. As you know, I have been ferreting for access to fibre for all of the last decade in order to achieve my vision which is Fibre To The Home. In particular, MY home, but also to every rural home!

Now, courtesy of my friends, I learn that there are more practical ways to lay fibre using animals, and it is being done today in Vermont. A place I am regularly invited to visit to see the projects there, and of course, home of my very good friends and mentors, Tim and Leslie Nulty. Whose most recent success in rural community fibre networks you may have heard about over the last month.....

Yep, you heard it here. Get out your horses, return to the ways of the 50s and before and start ploughing!


This horse is laying fibre in Vermont. Not wishing to take work away from our local digger drivers when the rural fibre lay begins, but it is all about using the right tool for the job.

It is country show time, and there are ploughing competitions up and down the country. If you need to reduce your capex by cutting the costs of civils, I would suggest that a day out at one of these great shows might be the source of a most unexpected member of your community network team.

Read more!

Thursday, 30 June 2011

Google+ could kill broadband connections in (rural) UK!

Read more!

Got my invite to Google + last night, and have spent a happy few hours unwrapping its presents - it's just like Xmas, but this is actually fun! However.....

This blog post can be read at 5tth.blogspot.com




I spy a huge problem for anyone on a halfway crap broadband connection, or even the USC.

Google+, for those who don't know, is Google's next attempt at social networking like Facebook, Linkedin, Twitter and more all rolled into one, and right now it seems to be gathering fans and positive feedback from the limited number of people who have been let in on the first round of invites. The invite system has had to be closed down within just a few hours because of the massive demand, but many of the people already in are the hardcore early adopters who are putting this through its paces as I write.

So, I've played on it quite extensively over the last few hours, and Google are saying that so far only a few features have been rolled out - there is obviously much more to come. The one that I can see causing immediate problems for broadband is Hangouts.

Hangouts let you invite, at present, up to 10 people into a video, audio and chat room. Like Skype on steroids really. Judging by what Matt Cutts (he of Google fame) is saying in Robert Scoble's profile, there are plans to make Hangouts way more funky yet - more people, more features etc. All of these will require bandwidth at the user's end. Not only can you do video chats, but you can also group view YouTube videos and comment on them. And that's just for starters....Wait till people are in 5 hangouts at the same time; I had 7 open at one point to see how good my multi-tasking is (!) and the connection just couldn't cope, despite my pleas!

Bear in mind, I'm looking at this for clients at the moment and not for fun, then the possible business uses are endless. And hence the likely use of bandwidth is only ever likely to increase as Hangouts are broadened and functionality is added. Chuck it into a friends and family environment and the likelihood is that this could totally hammer bandwidth on your average so-called fast broadband connection in the UK, up and down.

Just because right now it only has a Youtube button doesn't mean that within days or weeks Google won't add "share your own video", "record this group" and multiple other possibilities. This means that, as of tonight, the USC is totally insufficient for the likely places that Google's social network is going. And the general feeling right now seems to be that Hangouts are going to be the 'must have' app that sees Google+ taking off.

Whilst Wave and Buzz fell at an early hurdle, it seems Google has learned from those mistakes and there is much in Google+ which gives early indications that Google have no intention of getting "social" wrong again. It would also seem that Google are going to use Google+ to force the fibre agenda forwards, and that anyone who hasn't worked out that Google need fibre to get everyone maxxing out on Google properties...well....it's time to get IT fast!

Facebook may well push an upgrade out quite quickly on the back of this - Facebook chat has been pretty shoddy to date, showing FB up as an almost analogue property. With Skype belonging to Microsoft, and Google launching chat and video on day one in Google+, Facebook seems to be a bit of an outsider at the moment on the VOIP and video front. But Facebook has a fair amount of clout and money and has undoubtedly been working on this for some time because it is a much-needed and wanted feature for any social network.

This video conferencing feature, plus the ability to group view and share videos will start to consume bandwidth. And those who cannot chat with at least 9 of their mates/colleagues/family members will inevitably feel left out. I don't yet have any info on the bandwidth that Hangouts consumes, but having tracked down quite a few of the Google development team in the last few hours, I hope an answer will be forthcoming quite shortly...


Read more!

Friday, 24 June 2011

Let's make IT simple in the Bit Society

Read more! Ah, another week hearing about, and seeing first hand, how few people get IT. So, let's encourage folks to catch up.....We have all these great IT and money-saving ideas out in the Big Society so let's share them.

This blog post can be read at 5tth.blogspot.com



1. Stop printing business cards to hand out willynilly to all and sundry. Print a few only and put a QR code on the back.

qrcode

That is the QR code for this website. Right click and save to promote the site!

Next time you meet me, I'll probably be wearing the QR code with my contact details. It may be on the bottom of my boots as I seem to be spending my life on either my knees or bum at the mo ;o)

(Want to make your own QR code?
Want to read a code on a smartphone? Use Scan on iphone or zxing on android - there are multiple others).

2. Stop printing out documents. Apparently some MPs have, to date, been able to get docs printed and couriered to them. Now, they have to read them online. Good. We all should read online where possible.
(However, the paperback version of Quakebook is now available on Amazon.co.uk and you *must* buy that!)

3. Much as we want to keep the Post Office afloat, do you really need to post that form/letter/document? Could you just email it instead? I spent an happy hour persuading my Council to email me all my Council Tax info instead of posting me it multiple times. The lovely IT man set to and it turned out the system could do precisely that. Hopefully, now, the potholes may move up a notch or two on the budget priority list with the spare money this could release if applied to every householder, before I fall off the Ducati.

4. Set up a website for your Parish Council, District Council etc that does not say ring this number on an expensive phone line to request a copy of xyz document. If we can use DropBox, so can our local government. This should be used in particular for planning applications where the amount of paper relating to a complex application could have been used to produce biomass for the buildings in the development for the coming year(s).

Further suggestions from you are welcome!!

Let's make IT simple in the BIT Society.








Read more!

Tuesday, 21 June 2011

Cart before the horse

Read more! Seems to me, as I sit in a sunny Surrey garden pondering the many discussions yesterday in The Smoke, we are not doing things in the right order with broadband in this country. The government have recognised the need and found a pot of money - all well and good, but...
This blog post can be read at 5tth.blogspot.com



The next step, surely, should be for each region to calculate how much money is required for the solution(s)and where any money assigned to the area will do most good in generating, as quickly as possible, the remainder of the money required?

This is how a business would work... Which product should we develop and put out to which market for maximum ROI, particularly during a recession when times are tough?

One wonders what criteria are being used to decide which region gets what considering the vast majority of the regions do not seem to have a pre-defined plan for what they will do with what they are given. Some do seem to have realised the BDUK money is for rural areas where there has already been market failure to deliver broadband 1.0; others do not seem to gave truly grasped even that basic point.

Once awarded funds, surely the very first step should be for the council to appoint a suitably knowledgeable panel to assess appropriate solutions available with said pot of gold, or have we taken to developing products blindfolded and in the dark now?

Not having more than the most vague idea of what is possible per £, the approach appears to be putting out a similarly vague procurement doc with untold extra limiting factors to see who may be interested in laying their hands on the dosh. Or who the Council is left with after excluding a substantial number of potential solution providers due to the (quite unnecessary) restrictions.

Hard evidence is available from around the world that FTTH is profitable with some networks going in to profit at the moment of switch on. However, a business-like approach appears to be lacking here. Which provider and/or solution is providing a business plan and road map showing how further areas of Market failure will be funded once the pilot area is complete? Because this is not a one off task but rather an ongoing one for each area. It is unlikely further central funds will be available; ergo each region should be deploying solutions which seek to generate the monies required for further investment.

This could be done by ensuring that any solution is set up to run as a commercially viable entity, rather than just lobbing the money at a solutions provider looking to bank all profits themselves. Councils are more accustomed to having an annual budget made available to them, rather than operating as a business needs to where next year's spend comes from the wise decisions of previous years. In this instance, and knowing what work lies ahead, the required approach would seem to be obvious for any business-minded person.

But obviously logic and common sense has gone out the window! In fact, we seem to be watching an abject failure to put Big Society into action. Us little folk who need and know this stuff plus the biz people with required acumen to create business plans are being steam rollered and ignored by the very agencies Big Society was supposed to give ears and a brain to.



Read more!

Monday, 20 June 2011

Watch Northumberland

Read more! If the £250k for rural broadband in Northumberland is spent on anything other than FTTH, then this country seriously needs to get its act together and rethink what on earth we are doing with the limited EU funds still available to us.
This blog post can be read at 5tth.blogspot.com



The money from the EU should not be signed off by either Govt or the EU unless it is being spent upon bringing Fibre To The Home to these outlying areas with nowt, first, and then using that connectivity to reach back into market towns and areas of higher density population. This 'outside in' approach that some of us have been pushing for for years does appear to be in GreySky's thinking judging by James Saunby's response in a BT-sponsored debate.

Read more!

Tuesday, 14 June 2011

The next generation reach for the sky...but what are we doing to them?

Read more!
Copyright: LAnnison 2009
Remember: Next Generation Access - it's not about YOU! Seems odd to me that a nation which had an Empire, a future, and innovated to such an extent that we were held in respect by the rest of the world has lost its bottle so much that we now seem to be known more for the stiff upper lip. The "quiet English way of objecting" is to take most things lying down, not make a fuss...whilst we are held hostage, and walked all over. I saw this at work in a restaurant when a bloke emptied an entire pot of salt over his as yet untasted dinner because the kids had unscrewed the salt pot lid as a joke. "Everything all right, sir," asked the waiter. "Yes, lovely, thank you". Are we really so spineless?

This blog post can be read at 5tth.blogspot.com



Whether or not you care about the current kerfuffle about Tower Bridge, that is what has triggered this post. As ever, my joining up of dots may leave you struggling a tad to follow me, but....

Read more!

Monday, 6 June 2011

This harsh geography is not conducive to fibre lay.....

Read more! I have to admit my jaws ceased to meet on overhearing this the other day....not that title statement, but what followed. Libby Bateman, you are a very astute young woman! And if anyone headhunts her from Eden, you will find yourself facing Rory's Reivers and many more who value her, who will fight tooth and nail to keep her here where she belongs, doing what she is incredibly good at, and putting hundreds of overpaid people to complete shame. In our region as well as in most others. Libby is Big Society personified - learn from her.

This blog post can be read at 5tth.blogspot.com



Location: Rheged. When: coupla days ago. Present: someone with a "Responsibility for making life-changing decisions about broadband for some of us". (I actually like this person, but ....well, another blog post will be writ on that matter.)

(Paraphrased) Libby: Laying fibre across Cumbria is a nightmare of an engineering task. "Apparently." According to the telcos. In tiny little trenches. But look what runs right through our region? The Settle-Carlisle Railway. So, over 100 years ago with no mechnical assistance whatsoever and in the most difficult of climates, they could build a world-renowned railway, with viaducts such as Ribblehead, tunnels and bridges, the longest, steepest hauls on UK rail, through some of the harshest [yet most beautiful] landscape there is. And yet now they are claiming no-one can lay fibre here?

You have to admit, she has a point. So, you short listed folk, get this. If you don't lay fibre across this county, we'll take to you to the bloody cleaners for incompetence and failing to learn from the past. Not just in the last century and more, but the last decade too.

You will NOT repeat Project Access's utter failure on our doorstep again. Not with this region's history for DOING MAJOR ENGINEERING WORKS right. We are not Numbrians. We are proud of our heritage and want to leave our legacy for future generations too.


Read more!

Wednesday, 1 June 2011

Dumbing smart meters down

Read more! What is a smart meter? Is it simply a digital meter that feeds info back to the utility companies so they can lay off meter readers? Or is it something more?


This blog post can be read at 5tth.blogspot.com


Despite having seen 'smart meters' that have built-in wifi, GSM etc, which create a mesh network or more, and having blue prints for ones with built-in femtos etc, which join up dots because they are a device which can be fitted in every house and therefore do far more than one job, apparently we should dumb smart meters down to a single use.

Apparently, a smart meter is now a dumb meter, according to the conversations yesterday on Twitter. No doubt, shortly, the UK will be building future-proofed dumb grids as well, and failing to learn from smart grids around the planet.

I am beginning to despair at the UK's aspirations. Isn't our bar already low enough?! We have an opportunity to fit into each and every home a 'device' (let's bin the word 'meter' as that seems to confuse folk) which can serve multiple purposes which solve many of the connectivity and utility problems we currently suffer.

Or we could spend £umpteen zillion, at householder's and Treasury expense, to teach the people of this nation how to hit the off switch when they leave a room. Genius. Not.

How smart are *we*?!
Read more!

How low can we go in the UK?

Read more! I am going to take the latest PIN from DCMS to bits. Every which place I am wrong, correct me. There are plenty of people who read this blog who could just for once come out of the woodwork and contribute, instead of leaving my pet trolls to do so alone. This Framework has been causing discussions in many circles for at least 2 weeks before it was officially announced, and it is IMHO time to get this country back on track before it is too late.

This blog post can be read at 5tth.blogspot.com



This is the PIN (Prior Information Notice) for DCMS and BDUk for around £2Billion.

The primary purpose of this Prior information notice (PIN) is to inform the market of a prospective opportunity in connection with the UK Government's broadband policies and objectives.

The delivery of high speed connectivity to businesses and residential consumers and communities is required to address the UK’s economic growth and development agenda. The topography and/or demographic characteristics of certain geographies will require investment to deploy broadband infrastructure and this, together with the lack of competitive pressure, means that market-driven private investments alone will not achieve ubiquitous connectivity.

1. All topographies and demographics require investment to deploy broadband infrastructure. END.

2. Lack of competitive pressure....ah, are we now re-wording the term 'market failure'? If that is truly the case, then let's ask ourselves why and according to whom? Could it be that there is a certain incumbent who is ensuring that the pipes are so damned thin there is no pressure (scarcity vs abundance)? No access to the pipes - could that be inhibiting competitive pressure? No market - says whom? Perhaps we should revisit who is touting this so called "lack of competitive pressure"? And is it real when so many people seem ready to invest, dig, connect etc?

3. Could we please determine a time frame in which "market-driven private investments alone will not achieve ubiquitous connectivity?" Because given a few more months without public sector investment from the Treasury's coffers, communities large and small will pull their fingers out and connect each other. Bit like railways, electricity etc. Many of which were not publicly funded nor were there so-called incumbents preventing their every move. Communities still beat the private investments to delivery - in both the rural villages I have lived in during the past 37 years, electricity was delivered by individuals not market-driven investment from shareholder owned companies or incumbents. In fact, we had electricity before Manchester, and Lord Glenamara (who became Chairman of Cable and Wireless) wrote about it in his book. Market-driven? Hell no. Innovator, edge of the network, experiment-driven. Are you really going to skew the market by giving ALL THE MONEY to a behemoth, oil-tanker sloth that doesn't love each community it connects but only the profits it can reap for its shareholders?


Broadband Delivery UK (BDUK) has been created within the Department of culture, media and sport (DCMS) to be the delivery vehicle for the government's policies relating to stimulating private sector investment using the available funding. Further details on BDUK, its objectives and activities can be found at: http://www.culture.gov.uk/publications/8124.aspx.

I'd love to query the lack of capital letters in a major tender for £2Bn....but it would be more interesting to query that publication and BDUK about their achievement of those objectives to date.

BDUK is seeking to establish a framework agreement of suitably qualified prime contractors capable of delivering local broadband projects as required by local bodies or groups of local bodies. "Local bodies" potentially includes local authorities, local enterprise partnerships, devolved administrations and other public sector bodies.

Wait just one minute. Haven't we been here before? With first gen broadband? Can I not recall OGC asking for 12 suppliers for broadband solutions? And the massive outcry there was at the time about the failure to permit new entrants etc in to the game? Didn't we end up with something that (sorry, Paul) was called OGC BS (Bullshit or Buying Solutions, take your pick), and which resulted in a total failure to deliver first gen and IT solutions through 'preferred suppliers'? Isn't that what we have here, again? Are we really, so soon, going to repeat a similar futile exercise? Cut out all the innovators, new entrants, solutions providers already on the ground and digging into the ground? Seriously?

And who is defining 'Suitably qualified prime contractors'? A bank? Are any of these prime contractors going to be assessed on :

Failure to deliver consumer and business broadband requirements to date
Over-priced access for any third party to infrastructure built using public money
Failure to keep Britain in the broadband game through innovation


Prime contractors will need to be capable of delivering a range of broadband and related requirements, including (but not limited to):
— The design, build, integration and operation of wholesale broadband networks at a county, multi-county or regional level. Such areas could be of potentially up to the order of 500 000 premises,
— Broadband solutions that meet outcomes-based specifications rather than being tied to specific technologies and platforms,
— Open access wholesale services including for retail service providers (e.g. Internet Service Providers) to include as part of retail broadband packages for business and residential customers.
It is currently anticipated that: the framework agreement will be for a duration of two years with the possibility of up to 2 one-year extensions; and the contract notice for this framework agreement will be issued by the end of June 2011.


Right, one at a time. If these prime contractors were capable of delivering such a range of requirements, why have they not already done so?

Hasn't the noise from grassroots level reached BDUK about the huge dissatisfaction over the four pilots? From choosing the wrong contractual body (eg county councils who are being hit from all sides by public sector cuts, who have little comprehension of broadband tech or usage, and who are busy trying to tie in PSN, council and education networks into an 'innovative pilot' (cough, splutter) that brings telehealth, education and e-gov into homes, businesses, schools, GPs etc) to demanding £100M in the bank to connect a tiny village to show how it can be done elsewhere - do you not get it yet???

Have you not assessed what wholesale broadband networks are in place eg CLEO in Cumbria and Lancashire, and thought, "Hey, maybe we don't need to re-invent the wheel?"

Have you not mapped the existing infrastructure and said, "We don't need to spend £2Bn putting in a framework agreement - that would be a pure and simple waste of public money. What we need to do is force the existing infrastructure owners, the consumers and communities (however large or small) and our so-called Big Society government to join the dots."

Have you not considered that "outcomes-based specifications" is a totally lunacy when no-one can possibly know what is round the corner? Are you going to specify that one of the outcomes is that everyone can watch iPlayer or BBC News on the move, or are you going to accept that probably less than a year down the line bog standard TV will become old hat when everyone can livestream from their jumper?

Have you actually thought out why an ISP is required? Connect me or my neighbours into a DVP and why do I need an ISP? To be regulated? Oh, get on. Read the Dumb Network and work it out. ISPs are so yesterday, as is DRM etc.

We need dumb fat pipes. We have been saying it for years. Some people may need services, such as VM and Sky TV, but give people access and they will find their own content, make their own content, bundle their own packages and services, develop their own apps, create innovative apps as we see in Chattanooga, and much, much more.


Whilst local bodies may elect to deliver broadband via other procurement routes,
Except we, BDUK, may force them down a route where this is impossible, eg by issuing a Framework agreement that all local bodies must adhere to if they want any of the pots of money the Treasury has cajoled out of the likes of the BBC Licence Fee etc

BDUK expects that a majority of the available funding will be accessed via call-off contracts from this framework agreement. There is the potential for the framework agreement to cover projects with a total value of up to 2 000 000 000 GBP or more.
Further details on this opportunity will be provided at the industry day (see below). This further information may include information on: the scope of the framework agreement; the award procedure to be followed; anticipated timetable; funding; etc.estimated cost excluding VAT 2 000 000 000 GBP
Division into lots No

Division into Lots? No bloody chance. That would be opening the door to discussions with people who may be right, and prolong the agony for all concerned far beyond the next election.
Read more!

Thinking Down and Dirty

Read more! Last week, courtesy of Jazz at @geonetworks, I had an interesting trip down the sewers within sight of the Olympic Stadium in East London - probably the closest I will get to the Olympics. Here follows some info, photos and thoughts from that trip.......

This blog post can be read at 5tth.blogspot.com



We met outside a rather posh hotel in Liverpool Street and during that brief wait, I found myself talking to @superglaze aka David Meyer, who some of you may know from ZDNet. I thanked him for getting the answers I had asked for from JANET about why they had upgraded their core network to 100Gbps. Those answers from JANET are well worth a read if you think a USC of 2Mbps is sufficient......

We took a taxi to Bow and prepared ourselves for the descent into the unknown. White suits, rubber gloves and a rather funky pair of fisherman's socks, all encased in waders. A safety briefing from our inimitable guide, Rob, who I suspect should have his own radio show, and we were hooked up to clamber down the ladder into one of the two barrels which had been closed off for our visit and other maintenance work.


Superglaze gazing downwards....




Once in the barrel, we could see the four ducts coming in from street level. (My iPhone packed up as a camera at this point so further underground photos can be found on geonetwork's Flickr stream....)

These four ducts have 144 cables in each - as should *any* ducting being laid in 2011 and beyond, with 288 in each duct in areas like Docklands and other high density areas. 1 is used for customers and 1 is used for testing. The other two are there for upgrades and to check for degradation faults.

Geo networks has 107km ([Corrected from 50km] of ducting laid in London and 3000km [Corrected from 2000] across the UK. Those ducts are tested against everything you can think of - rats, beer cans, sewage etc. (The ducts are that diameter because rats cannot get their jaws round them to gnaw!). The ducts are laid about 5+ feet up the walls of the sewers to keep them out of the way of "rags", high water level, and jetters. Jetters are like high pressure water jets which come in to clear blockages, and also drag any blockages back along the sewer to remove it, which means loose lay - as H20 have attempted - can be an issue as the fibre can get caught in the machinery. The cinders which we crunched over on the floor turned out to be tarmac which has washed down the gutters over the years. (I suspect it would be preferable not to recycle it, but there's a challenge for someone if we run out of oil to make tarmac to fill in potholes...!)

When choosing where to lay the ducts, Geo first use maps of their network, maps of other networks, and Google Earth and Streetview to analyse the best route above ground. Within the sewers, ducting is usually laid on the opposite side to manholes and entrances to avoid any possible accidental damage. So, in the sewer we were in, the ducting was laid down the right hand side as all further manholes were on the left in the 4 miles to the main processing plant. At the time we went below, across the entire London Geo network, there was a mere 4m of ducting which required re-affixing to a wall. Normally, there is a 4hr time limit to fix customer problems but Geo has had 100% uptime since the vast majority of it was laid in the last 5 years.



Rob told us about Santos, which sounds remarkably like Google's infamous TISP fibre April Fool; but this is a serious solution. The plan is to bring fibre to homes and buildings by bringing the fibre not to the nearest manhole in the street, but through the sewers into the basement etc of the building and then breaking out. This is a particularly great solution for towerblocks etc.....However, rural folk have not been forgotten and there are plans for fibre sewer entry through mini sewers rather than these enormous sewers we were standing in.

When the figures of what was being carried through each duct were provided, I did debate whether I could become a 'sewer rat' and just live down there. 80 wavelengths each carrying 100Gbps, giving a total of 8 terrabits per second - so near and yet so far! 2 years ago, there were a mere 32 wavelengths of 10Gbps each. The IEEE is keeping everyone on their toes by ratifying new standards so the fibre within reach (no, you just wouldn't want to!) was G.652 metro for short hops and in rural areas you would use G.655 for longer hops.

There are no joints within the sewers where possible, and once we got to the huge metal bulkhead door and the false bottom floor maneouvred by chains, you could fully understand why! At that point you began to understand the power of the 'water' that would soon be flowing back where we were now standing.

The engineering within the sewer was astounding. That false bottom and the bulkhead were Victorian and still fully functional, although Rob hammered it home that raising that false floor to drop raw sewage into the Thames was probably treason - definitely a "Here's your P45" offence anyway.

Sir Joseph Bazalgette , who designed the sewers by assessing London's waste problem, guestimating the size London might grow to within the lifespan of the sewers and then doubling his estimates, was a bloody genius who, as Rob pointed out, did not have civil servants, limited budgets, accountants, or quantity surveyors saying, "Those 2p bricks are too expensive, let's use cheaper ones" as he would have today.

Bazalgette's foresight and generosity in diameters and overflow systems works today. Whilst he never foresaw high-rise buildings, nor the phenemonal sprawl that London has 'enjoyed', Bazalgette's approach to raw sewage should be applied today in next generation network planning and build.

We are only going to do this once, and we should be doubling the most generous guestimates of data need, as Bazalgette did with sewage. C'mon, are we so dim as to ignore Victorian engineers who were the envy of the world?


Possibly the worst part for me was seeing the completely numb metal plates that have been placed over the incredible arches the Victorians built to ensure that the overflow level is raised to ensure it will be far higher during the Olympics and will not flood the River Lea, which is part of the Olympic waterway. Future generations will look at these and wonder at a generation who seemed to have little pride in their engineers, and were held hostage to a lack of joined up thinking, profits and built-in obsolence.

The barrels we were standing in sit atop a duplicate set of barrels for the overflow system - a double-barrelled set up! Makes you look at drains in a totally different way once above ground - it's very much an 'iceberg' - far more below than at street level. The arches and walls begin at a height of over 4 ft from the floor and only once the water level passes these walls does the overflow cascade into the lower levels. Each arch is a triumph of Victorian brickwork, now hidden under 21st century cost-cutting exercise.

One of the other Victorian 'niceties' of the system were snow shutes built into the roads. Down these were shoveled snow by the road cleaners, thereby removing it entirely from the London road network, unlike today where the place seems to grind to a halt if an inch of snow falls.

We learn about the install process - plan route, install plastic hangers for the duct, fit duct in gentle curves to ensure no breakage of the glass fibre, blow fibre, connect customers. It all seems so simple. And we know it is, when you remove the chancers who do not have the ethics of our forebears who left a legacy for us in railways, canals, sewers etc. We hear about this current failure to enhance ours and the next generations' lives in a disturbing way....

Often, when planning a route through the sewers, the Geo and Thames Water teams find themselves up against sections of sewer where bombs fell during the 2nd World War. At the time, because obviously, there were other things going on above ground that needed attention urgently, a wall was built around each end of the destroyed section and a pipe shoved through to keep the sewage flowing. In the 60 intervening years, we have done little to nothing to fix those sections of sewer barrels.

Our moral fibre appears to be lacking. Are we building 'best networks' for the next generation, or 'best networks for profits"?

All in all, a highly enjoyable day courtesy of Geo and I will find out the name of the Geo gent who introduced me over a glass of water afterwards to the concept of "From POTS to PANS" - Pretty Awesome New Stuff, which has had me thinking far too much!! (I think it was from Intel some 10-15 years).

It all highlighted why we need to learn the lessons from the past.



















Read more!